Skip to Content

Experience & Expertise

Wells & Water Systems offers comprehensive expertise in all aspects of the water well industry. Our team has successfully completed a diverse portfolio of projects, demonstrating our capabilities in well design, drilling, pump installation, rehabilitation, and abandonment. 

We partner with municipalities, government agencies, agricultural businesses, and private entities to deliver reliable and sustainable water solutions.

Our Core Services

Municipal Well Drilling & Development: Designing and constructing high-capacity, reliable water supply wells for cities, counties, and special districts.

Well Rehabilitation & Acidization: Restoring well efficiency and extending service life through advanced rehabilitation techniques, including HCl and CO2 acidization.

Pump Installation & Repair: Expertise in selecting, installing, and maintaining a wide range of pumping systems to meet specific project requirements.

Well Abandonment: Safe and compliant abandonment of wells of all types and sizes, adhering to all state and local regulations.

Geophysical Logging & Testing: Utilizing state-of-the-art logging and testing methods to assess well conditions and optimize performance.

Featured Projects

City of Venice/Andrews Sitework: Successfully completed a complex well installation, including setting 40-feet of 34-inch steel casing, drilling pilot holes to 250 feet, conducting geophysical logging, and setting 250-feet of 14-inch SDR-17 well casing. Ensured a secure and reliable water source.

Gateway Services District: From road and pad construction to well installation and pump testing, we delivered a turnkey solution, including drilling to 850 feet BLS and performing geophysical logging with video.

Bonita Springs Utilities: Ongoing multi-phase project involving the drilling of 12 wells, including pilot hole drilling, geophysical logging, casing installation, acidization, and pump testing. 95% complete.

Collier County Well Acidification & Rehabilitation: Rehabilitated six wells by removing owner's pumps, conducting pre and post pump tests, suppressing flow with salt, installing acid lines, pumping acid, removing acid lines, conducting air and pump development, performing post step pump tests, and disinfecting.

Island Water Association: Completed a successful well rehabilitation project, including pre-pump testing, removing the pump, installing an inflatable packer, installing an acid header and trimmie line, installing high strength HCL 32%, removing spent acid, developing the well, reinstalling the pump and piping, and performing a post test.